Congrats University Park Mall in Mishawaka (South Bend) for new Electrify America DC Faster Charger installation!
The charger looks to have eight stalls and is located on the Macy’s side of the mall, (West) while the Tesla Supercharger is on the East side near Barnes and Noble. Still under construction but almost finished. From outside the fence, I could not tell if it was CCS or ChaDEmo. I did not see Level2 ports but in any event, a great addition for EV’s in Michiana.
We will take a look at this during our informal meet up and lunch on January 12 at 12 noon.
Do any other INTOC members see Electrify America sites being installed in Indiana?